Experience, Innovation and Service
in INDUSTRIAL FURNACES and REFRACTORIES

Search for a product by its name, characteristics, etc ...

Blog

  • SUMMER - Melting Tower

    Some of our customer in Casting Aluminium, taking advantage in summer holidays to setting up their Melting Towers. INSERTEC, Put at your disposal an engineering studies; Combination of Refractory castables and precast pieces to rehabilitate and optimize the performance of lining. SIFCA technology supposed an excepcional solution reinforcing more critical areas, combining mechanical and refractory properties. THERMBOND technology, optimizes and minimizes partial repairs thanks to its properties of chemical adhesion to old lining.

  • THANK YOU for visiting our stand at the GIFA 2019 show!

    We had a successful show and we could not make it with out you

  • Tilting Reverb Melter Aplication Report

    illet Casthouse Melting unit Aluminium Tilting Reverb Melter MELTING PRODUCTION RATES  Furnace capacity....................................................12 Ton Material to process - 70% Baled or loose clean Window frames & profiles,Occasionally painted or dirty scrap - 30% Primary Ingot bundles Melting load ..................................................8.800 kg Melting rate ................................................... 6.000 kg/hr Bath dimensions ........................... 3.400W x 6.500L mm Regenerative Burners natural gas ................... 4.700 kW Total cycle time ................................................. 2h20min Number daily casting billets ....................... 10 cycles/day Logs Productivity (billets Ø7” & Ø9”) .............. 85 ton/day Yearly production 330 days/year ................ 28.000 ton/yr dedicated Charging Machine, for processing logs 85 ton/day. Melting Production rates.

  • INSERTEC, & RENAULT collaboration

    RENAULT – The RENAULT Group has officially started its new manufacturing Plant in Valladolid, devoted to the manufacturing of the last generation of 3 and 4 cylinders blocks. INSERTEC, among the collaboration framework reached with the RENAULT Group, which started in 2016 with the supply of several melting and heat treatment furnaces for the new Plant that RENAULT set in Curitiba, Brazil, has already supplied for the new Plant in Valladolid three Meltowers of aluminium and four T5 rotary hearth heat treatment furnaces, based on the latest generation design of our technological partners of Sanken Sangyo, from Japan. But the collaboration framework is not yet finished, as there are already additional expansion plans for the Valladolid Plant, as well as another greenfield Plant in Bursa, Turkey, and performance and capacity expansion plans in their traditional Plant of Cleon, France, where INSERTEC will supply additional melting and heat treatment furnaces. Oscar Iribarren.-28 de Febrero de 2019

We will be in:

XVII Simposium 2019

2 -4 October 2019

XVII Simposium 2019

San Luis Potosí

MetalMadrid 2019

27 - 28 November 2019

MetalMadrid 2019

Madrid, Spain

EUROGUSS 2019

14 - 16 January 2020

EUROGUSS 2019

Nürnberg, Germany

30 years of experience and a innovative character
they have taken us to be present all over the world
INSERTEC
http://m.juhua483386.cn|http://wap.juhua483386.cn|http://www.juhua483386.cn||http://juhua483386.cn